ProAV Bridge Test Plans

The test plans on this page may be downloaded and used for internal purposes only. The test plans may not be commercialized in any way without express permission of the UNH-IOL.

The ProAV Bridge testing service currently offers the following test plans. These documents are constantly being updated to improve readability and to reflect the current specifications. Please contact us if you would like more information or have questions about the ProAV Bridge testing service.

When testing based on the following test plans is performed, all reports generated will be digitally signed using an Adobe digital certificate. Upon reception of the report, the recipient can verify its authenticity using our document validation instructions.

AVnu Alliance

Certification

Status
Fully Documented (Active, see notes)
Revision
1
Testing Days Needed
Last Modified
2013-04-04
Abstract
This testing addresses the set of requirements for AVnu Alliance Bridge Certification. Test details are available through the AVnu TWG and C&I committees.
Notes
Testing is restricted to AVnu Alliance Members. Please contact the AVnu Alliance (www.avnu.org) for membership details.
Status
Fully Documented (Active)
Revision
0.1.1
Testing Days Needed
6 week
Last Modified
2016-06-29
Status
Fully Documented (Active)
Revision
v0.5.1 (see latest@AVnu site)
Testing Days Needed
2 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2857/latest
Status
Fully Documented (Active)
Revision
Testing Days Needed
1 week
Last Modified
2025-03-27
Abstract
Avnu Component Certification testing for 802.1AS-2020.
Status
Fully Documented (Active)
Revision
Testing Days Needed
1 week
Last Modified
2025-03-27
Abstract
Avnu Component Certification for IEEE 802.1Qav, Credit Based Shaper (CBS) defined in the FQTSS clause of 802.1
Status
Draft (Active)
Revision
Testing Days Needed
1 Week
Last Modified
2025-03-27
Abstract
Avnu Component Certification for IEEE 802.1Qbv, Time-Aware Shaper (TAS) defined in the FQTSS clause of 802.1
Status
Draft (Active)
Revision
Testing Days Needed
1 Week
Last Modified
2025-03-27
Abstract
Avnu Component Certification for IEEE 802.1Qbu/802.3br. Referred to as Interspersed Express Traffic (IET) or more generally as Preemption.
Status
Draft (Active)
Revision
Testing Days Needed
1 Week
Last Modified
2025-03-27
Abstract
Avnu Network Certification for IEEE 802.1BA, ProAV Profile.
Status
Fully Documented (Active)
Revision
v0.4.1 (see latest@AVnu site)
Testing Days Needed
1 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2855/latest
Status
Fully Documented (Active)
Revision
v0.4.2 (see latest@AVnu site)
Testing Days Needed
2 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2856/latest
Status
Fully Documented (Active)
Revision
v0.3.2 (see latest@Avnu site)
Testing Days Needed
3 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2859/latest
Status
Fully Documented (Active)
Revision
v0.3.1 (see latest@Avnu site)
Testing Days Needed
2 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2861/latest
Status
Fully Documented (Active)
Revision
v0.4.3 (see latest@AVnu site)
Testing Days Needed
2 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2967/latest
Status
Fully Documented (Active)
Revision
v0.4.1 (see latest@AVnu site)
Testing Days Needed
2 week
Last Modified
2014-03-01
Abstract
Refer to: http://members.avnu.org/apps/org/workgroup/technical/download.php/2862/latest

Key

Fully Documented
Draft